Being farmers, most of our good weather is used making hay. So when we do have down time to do house projects, it is usually in the winter. Many of our projects have been started
January 1st. There isn't a particular reason, but my best guess is the guys have cabin fever.
This year was no different. I was scheduled for hand surgery January 8th, and on January 4th, the reconstruction of the bathroom started. The timing wasn't that great, but we had the help, and I wanted it done.
Having a 1960's ranch, building codes where lax to say the least in those days. We have learned from previous projects, that you never know what you are getting into when you start.
We had some idea what this project may include, because we have semi remodeled it before.
It was a lick and a promise kind of job, paint, some new fixtures....
This time we were doing it from the bottom up, literally.
Some of the floor joists were cut in the original construction of the house, which caused the floor to sink 1 1/2 inches. I can't tell you how long it was that we had house floor jacks holding up the floor.
Several of the joists had to be replaced, which meant jacking up the house and putting in 12 ft boards. But it worked. Next came the demolition, to the studs!
New sub floor had to be laid, new dry wall had to be hung and a new tub surround put in.
Oh, by the way did I mention, we only have one bathroom. We do have a shower downstairs, but only one toilet. It had to be removed and replaced several times, depending on what phase of the construction we were in.
It was awesome. My brother put in the rest of the hall floor. The paper template on the floor is were the vanity will go. It is on special order and should be here in 2 weeks. We had such a problem getting one to fit the small area.
Dave wanted to go with the juniper ceiling. The wood is the same wood that is in the beach house in the OBX. It smells like cedar and the bath feels like a spa!
We chose a full size shower and surround. It only has a 4" ledge, and as we get older, we have to worry about accessibility and falls. All the walls were reinforced for grab bars to be installed at a later date.
We chose a full size shower and surround. It only has a 4" ledge, and as we get older, we have to worry about accessibility and falls. All the walls were reinforced for grab bars to be installed at a later date.
Mick and his friend helped with the painting, because I have a splint on my right hand and cannot do anything.....AGGHHH! The paint is a blue glaze over white and it looks like clouds, very soft. I love it.
The lights are in and the only thing left to do right now is the exhaust fan and new door. Of couse the vanity will be set when it arrives. This was a major project for us, so I think I will rest for now.
4 comments:
The new bathroom looks great! I love watching projects unfold - our home is in need of a couple by I don't have a handy hubby like you. Hope the hand gets better soon. So, you are on FB now too???? LOL it's addicting isn't it.
Please post pics of the finished project!
Looks great!!
Hey. I don't normally leave comments, but I just wanted to say thanks for the great information. I have a blog too, though
I don't write as good as you do, but if you want to check it out here it is. Thanks again and have a great day!
Wal Mart Rollbacks
Wow I love it! You are lucky you have help and a handy hubby. Labor is the biggest cost. I love the ceiling. Well, I just like it all! Good job and I know you will smile every time you sit on the toilet! BWHAAAAAA!!
Post a Comment